Experimental facility and method for studying jet impact characteristics at core outlet of fast reactor

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 11948698
SERIAL NO

17646205

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An experimental system a method for studying jet impact characteristics at a core outlet of a fast reactor are provided. The system includes a jet impact main loop including a water storage tank, plunger pumps, a filter, preheaters, a jet impact chamber, a heat regenerator, a condenser, valves, flow meters and pipelines connecting these facilities; a cooling loop including cooling tower, a cooling pump, a regulating valve and a flow meter; and a makeup water loop including a deionized water machine, a makeup water tank and a plunger pump. Water in the water storage tank flows to the heat regenerator via the plunger pump, is preliminarily heated by the heat regenerator and then is divided into three branches to flow to the jet impact container.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
XI'AN JIAOTONG UNIVERSITYXI'AN JIAOTONG UNIVERSITY NO 28 XIANNING WEST ROAD XI'AN

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Qiu, Suizheng Shaanxi, CN 11 4
Su, Guanghui Shaanxi, CN 12 9
Tian, Wenxi Shaanxi, CN 11 4
Wang, Mingjun Shaanxi, CN 12 47
Wang, Yingjie Shaanxi, CN 31 96

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Oct 2, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 2, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 2, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00