Thin-film-like composite of nanocrystal

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 11958756
SERIAL NO

16563180

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An object of the present disclosure is to provide a thin-film-like composite of nanocrystal, as a nanocrystalline material having excellent handling properties, which can overcome the above-mentioned problems of a nanocrystalline material having a powdery form while satisfactorily maintaining the properties of the nanocrystalline material (e.g., excellent catalytic activity). A thin-film-like composite of nanocrystal, characterized in that the thin-film-like composite of nanocrystal includes a thin-film-like connected assembly in which a plurality of nanocrystalline pieces each having a flake-like form and having a main surface and an end surface are connected to each other, the main surfaces of the plurality of nanocrystalline pieces exposed to the outside of the connected assembly are arranged so as to form gaps therebetween, and the connected assembly has a plan view area of 1 mm2 or more.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
FURUKAWA ELECTRIC CO LTDJAPAN TOKYO CHIYODA TOKYO TOKYO METROPOLIS

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kurusu, Kazuhiko Tokyo, JP 10 187
Tsuzuki, Yoshikazu Tokyo, JP 13 37
Wakae, Mariko Tokyo, JP 6 4

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Oct 16, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 16, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 16, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00