Air-conditioning apparatus

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 11959649
SERIAL NO

17603081

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An air-conditioning apparatus includes a compressor and an outdoor heat exchanger that operates as an evaporator. A first heat exchange unit of the outdoor heat exchanger includes: first heat transfer tubes extending in an upward/downward direction, and arranged apart from each other in a lateral direction; a first junction pipe extending in the lateral direction, and connected to the lower ends of the first heat transfer tubes; an outflow pipe connected to the first junction pipe at or below a center position of the first junction pipe in the upward/downward direction; second heat transfer tubes extending in the upward/downward direction, and arranged apart from each other in the lateral direction; a first distribution pipe extending in the lateral direction, and connected to the lower ends of the second heat transfer tubes, and a first connection part connecting upper ends of the first heat transfer tubes and upper ends of the second heat transfer tubes.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MITSUBISHI ELECTRIC CORPORATION7-3 MARUNOUCHI 2-CHOME CHIYODA-KU TOKYO 1008310

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kibe, Atsushi Tokyo, JP 8 0
Onaka, Yoji Tokyo, JP 47 65

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Oct 16, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 16, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 16, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00