Auxiliary power system for electric refuse vehicle

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11964566
APP PUB NO 20210339632A1
SERIAL NO

17373883

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A refuse vehicle including a chassis a body assembly coupled to the chassis, the body assembly defining a refuse compartment, an electric energy system, and an auxiliary power system comprising a reservoir to hold a hydraulic fluid, and a hydraulic pump powered by an electric motor, wherein the hydraulic pump pressurizes the hydraulic fluid to power one or more actuators, and wherein at least one of the electric energy system or the auxiliary power system is configured to provide power to a carry can.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
OSHKOSH CORPORATIONP O BOX 2566 2307 OREGON STREET OSHKOSH WI 54902-2566

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bolton, Mike Oshkosh, US 31 627
Clifton, Cody D Mapleton, US 89 2105
Hoover, Vincent Byron, US 116 1822
Kellander, John T Oronoco, US 57 1375
Klein, Zachary L Rochester, US 113 1788
Naglik, Shawn Oshkosh, US 42 428
Rocholl, Joshua D Rochester, US 136 2350
Smith, Chad Omro, US 96 930
Wachter, Skylar A Dodge Center, US 94 1704
Weckwerth, Clinton T Pine Island, US 113 1810
Wente, Derek A Austin, US 91 1669

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Oct 23, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 23, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 23, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00