Crystal structures comprising elastin-like peptides

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11965016
APP PUB NO 20220363734A1
SERIAL NO

17588579

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present invention relates to new biomimetic mineralized apatite structures. The present invention also relates to processes for the production of new biomimetic mineralized apatite structures based on natural and synthetic protein scaffolds. In particular, the invention provides synthetic crystal having a hierarchical structure formed on an elastin-like polypeptide membrane or hydrogel. The invention also provides methods of making such crystals, both in vivo and in vitro, as well as kits comprising membranes or hydrogels with cross-linking agents and/or mineralization solutions. The invention also provides the use of such structures in methods of treatment.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MINTECH-V LLC1209 ORANGE STREET WILMINGTON DE 19801

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Al-Jawad, Maisoon London, GB 3 1
Chavarria, Alvaro Mata London, GB 6 1
Elsharkawy, Sherif Ahmed Abdelsalam London, GB 4 1
Tejeda-Montes, Esther London, GB 3 1

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Oct 23, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 23, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 23, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00