Augmenting syngas evolution processes using electrolysis

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11965260
APP PUB NO 20230416931A1
SERIAL NO

18244923

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Methods and systems related to augmenting syngas production using electrolysis are disclosed. A disclosed method includes harvesting a volume of carbon monoxide from a syngas production system operating on a volume of natural gas, supplying the volume of carbon monoxide to a cathode area of an electrolyzer, and generating, using the volume of carbon monoxide and the electrolyzer, a volume of generated chemicals. The volume of generated chemicals is at least one of: a volume of hydrocarbons, a volume of olefins, a volume of organic acids, a volume of alcohols, and a volume of N-rich organic compounds.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
DIOXYCLERESIDENCE URBAN ART BAT B APPT B601 149 B CRS DE LA MARNE BORDEAUX 33800

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Lamaison, Sarah Paris, FR 22 2
Maistrello, Jonathan La Garenne Colombes, FR 7 0
Wakerley, David Paris, FR 21 1

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Oct 23, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 23, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 23, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00