Power converter having boosting mechanism with multi-shaft vertically stepped turbine

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11971007
APP PUB NO 20240044310A1
SERIAL NO

18267465

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A power converter having a boosting mechanism with a multi-shaft vertically stepped turbine includes: a shaft sleeve, a water inlet end base, an outer sleeve, a plurality of first stepped turbine units, a plurality of first shaft rods, a plurality of second stepped turbine units, a plurality of second shaft rods and a third shaft rod. The first stepped turbine unit is located above the second stepped turbine unit. The second stepped turbine units and the first stepped turbine units rotate in opposite directions. During a drainage process, water flows move in opposite directions and collide with each other to increase a water pressure. Due to the increase in the water pressure, rotational speeds of the first stepped turbine units and the second stepped turbine units increase, and rotational speeds of the first shaft rods and the second shaft rods correspondingly increase.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MARINE DYNAMIC (HAINAN FREE TRADE ZONE) NEW ENERGY TECHNOLOGY LIMITED1905 UNIT 1 BUILDING 3 HAITANG CENTRAL NO 6 LINWANG NORTH ROAD HAITANG BAY DISTRICT SANYA HAINAN SANYA 572000

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Tian, Xiaoming Sanya, CN 2 0
Yang, Biao Sanya, CN 14 17

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Oct 30, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Oct 30, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 30, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00