Process for manufacturing composite fiber products

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11981091
APP PUB NO 20210001574A1
SERIAL NO

16976209

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method for producing a product including a composite fiber part and a second part, wherein the second part includes a carrier part, wherein the carrier part is a replica of a press tool configured to be heated and to apply a pressure, the method including applying, in a non-cured state, the composite fiber part on the carrier part, arranging the carrier part including the composite fiber part on the press tool, curing the composite fiber part on the carrier part, and removing the product from the press tool, wherein after removal from the press tool the composite fiber part and the carrier part constitutes together at least a part of the finished product. Also disclosed is a composite fiber product including a composite fiber part and a second part.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
EOVIDAR AB232 35 ARLÖV

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Wettermark, Fredrik Limhamn, SE 2 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Nov 14, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 14, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 14, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00