Composite faucet body and internal waterway

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11982073
APP PUB NO 20220356685A1
SERIAL NO

17872873

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A faucet includes an internal waterway at least partially formed of a first material. The internal waterway includes a valve seat, a conduit, and a unitary body. The valve seat is configured to receive water. The conduit is coupled to the valve seat. The conduit is in fluid communication with the valve seat and configured to receive the water from the valve seat. The unitary body is formed of a non-metallic material having a processing temperature less than a temperature at which the first material forming the internal waterway is undesirably affected, wherein the unitary body is molded around the internal waterway.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
KOHLER CO444 HIGHLAND DRIVE KOHLER WI 53044

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kohler, Jeffrey A Richfield, US 10 273
Macon, David J Sheboygan, US 6 38
Manoni, Thomas Port Washington, US 4 1
Schibur, Mark W Sheboygan, US 10 14
Schumacher, Jeffrey A Port Washington, US 22 216
Tiwari, Vindhya K Sheboygan, US 4 1

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Nov 14, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 14, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 14, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00