Torque transmission shaft

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 11982319
SERIAL NO

17296017

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The torque transmission shaft has a shaft having a hollow tubular shape and a clamp. The shaft has a connecting portion integral with the shaft at one axial end portion, a slit extending in the axial direction in a portion on the other axial end side and opens on the other side in the axial direction, and a female serration on the inner circumferential surface of the other axial end portion. The clamp is separate from the shaft and has a non-continuous portion at one location in the circumferential direction, a pair of flange portions on both sides of the non-continuous portion, and a connecting portion connecting the pair of flange portions in the circumferential direction. The clamp is externally fitted and fixed to the other axial end portion of the shaft and reduces the diameter of the other axial end side portion of the shaft.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
NSK LTDTOKYO 141-8560

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Moriyama, Seiichi Maebashi, JP 55 452
Nakao, Keisuke Maebashi, JP 13 34

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Nov 14, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 14, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 14, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00