Supplemental fuel system for compression-ignition engine

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11988175
APP PUB NO 20230101065A1
SERIAL NO

17900095

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A supplemental fuel system includes a fuel mixer having a nozzle and a stem. The nozzle is configured to be positioned within a conduit of an air supply system for an engine. The nozzle has a body defining a first inlet, an outlet, a passage extending from the first inlet to the outlet, and a second inlet positioned between the first inlet and the outlet. The body has a first cross-sectional dimension that is configured to be less than a second cross-sectional dimension of the conduit such that (i) a first portion of air flowing through the conduit flows through the passage and (ii) a second portion of the air flowing through the conduit flows around the nozzle. The stem has a first end that interfaces with the second inlet. The stem is configured to extend through a wall of the conduit.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
AMERICAN CNG LLCLAYTON UT

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Matsukawa, Matt Layton, US 9 42

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Nov 21, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 21, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 21, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00