Air conditioner and control method thereof

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11988403
APP PUB NO 20210239350A1
SERIAL NO

17162305

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An air conditioner includes an outdoor unit having a compressor for compressing a refrigerant and an outdoor heat exchanger. A ventilator is connected to the outdoor unit by a plurality of refrigerant pipes. The ventilator includes a case having a supply passage, through which the outside air flows into the indoor space, a discharge passage through which the indoor air is discharged to the outside, a partition wall disposed in the case and separating the supply passage and the discharge passage, a main heat exchanger disposed in the supply passage, an outside air inlet damper, an indoor air outlet damper, a circulation hole damper, an outdoor temperature sensor, and a controller, configured to control operations of the dampers.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
LG ELECTRONICS INCSEOUL SOUTH KEREAN SEOUL

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Jin, Hongsuk Seoul, KR 4 1
Lee, Sanghun Seoul, KR 123 410

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Nov 21, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 21, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 21, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00