Translocatable slurry-containing hopper

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 11993192
SERIAL NO

17008358

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Several aspects of this disclosure relate to a translocatable hopper that is mounted for example at the forward part of a front-end loader vehicle. The hopper receives, re-positions and delivers a slurry to a jobsite and preferably is detachably attached to a vehicle. In several embodiments, the hopper is translocatable from a resting position to a delivery position through one or more intermediate positions. Preferably, a front wall has an outlet gate and a chute extending therefrom. The chute is configured to direct slurry into the jobsite, A rising and falling sluice gate is associated with the chute. The slurry moves outwardly from the chute when the sluice gate is at least partially opened as the hopper is placed at or near or above the delivery position above the jobsite.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
HOLMAN LAWRENCEWARREN MI

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Holman, Lawrence Warren, US 1 0
Masar, David Warren, US 1 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Nov 28, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Nov 28, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 28, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00