Hand-guided gardening, forestry and/or construction processing device and method for operating a hand-guided gardening, forestry and/or construction processing device

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 11997960
APP PUB NO 20210251151A1
SERIAL NO

17175362

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A hand-guided gardening, forestry and/or construction processing device includes a processing tool, an electric motor drive system, wherein the electric motor drive system is designed to drive the processing tool, a user-adjustable operating element, and a control device. The control device is designed to control a target slope rate of a rotational speed of the electric motor drive system in dependence on a position of the operating element according to at least one allocation in such a way that maximum target slope rates of the rotational speed differ for different positions.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ANDREAS STIHL AG & CO KG71336 WAIBLINGEN

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Buerckel, Philippe Waiblingen, DE 1 1
Haas, Alexander Spraitbach, DE 50 1119
Klaiber, Simon Tamm, DE 1 1
Leufen, Heinrich Schwaikheim, DE 19 238

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Dec 4, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 4, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 4, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00