Faucet main body structure and injection molding mold and molding method for the same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 12000502
APP PUB NO 20210054948A1
SERIAL NO

16995768

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A faucet main body structure, an injection molding mold and a molding method are provided. A main body inner core is fixed in the injection molding mold by a new fixing method, ensuring that no additional positioning structure is required to be provided on the outer surface of the main body inner core, so that in the case that the main body inner core is subjected to over-molding, a main body injection-molded layer of the main body injection-molded part is enabled to closely attached to the main body inner core without causing gaps therebetween, which ensures that the faucet main body structure is not susceptible to water seepage, and prolongs the service life of the product.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
PPI XIAMEN INDUSTRY CO LTDXIAMEN

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Lu, Wenrong Xiamen, CN 7 9
Zeng, Guangyi Xiamen, CN 3 8

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Dec 4, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 4, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 4, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00