Bismuth-substituted rare earth iron garnet single crystal, faraday rotator, optical isolator, and method for producing bismuth-substituted rare earth iron garnet single crystal

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 12012668
APP PUB NO 20230212783A1
SERIAL NO

17995989

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A bismuth-substituted rare earth iron garnet single crystal suitable for Faraday rotators and optical isolators with reduced insertion loss due to suppressed valence fluctuation of Fe ions is provided. The bismuth-substituted rare earth iron garnet single crystal of the present invention is characterized by the composition formula (TbaLnbBicMg3−(a+b+c))(FedGaeTifPt5−(d+e+f))O12. In the composition formula above, 0.02≤f≤0.05, 0.02≤{3−(a+b+c)}≤0.08, and −0.01≤{3−(a+b+c)}−{f+5−(d+e+f)}≤0.01. Ln is a rare earth element and may be selected from Eu, Gd, Ho, Tm, Yb, Lu, and Y.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SHIN-ETSU CHEMICAL CO LTDTOKYO JAPAN TOKYO METROPOLIS

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Fukuda, Satoru Annaka, JP 20 127
Watanabe, Toshiaki Annaka, JP 369 4832

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Dec 18, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 18, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 18, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00