Integrated production of hydrogen, petrochemicals, and power

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 12012890
APP PUB NO 20230258122A1
SERIAL NO

18307578

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A processing facility is provided. The processing facility includes an asphaltenes and metals (AM) removal system configured to process a feed stream to produce a power generation stream, a hydroprocessing feed stream, and an asphaltenes stream. A power generation system is fed by the power generation feed stream. A hydroprocessing system is configured to process the hydroprocessing feed stream to form a gas stream and a liquid stream. A hydrogen production system is configured to produce hydrogen, carbon monoxide and carbon dioxide from the gas feed stream. A carbon dioxide conversion system is configured to produce synthetic hydrocarbons from the carbon dioxide, and a cracking system is configured to process the liquid feed stream.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SAUDI ARABIAN OIL COMPANY31311 DHAHRAN

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Abba, Ibrahim Dhahran, SA 39 146
Bourane, Abdennour Ras Tanura, SA 112 1467
Harale, Aadesh Dhahran, SA 55 319
Jamal, Aqil Dhahran, SA 68 781
Younes, Mourad Dhahran, SA 39 244

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Dec 18, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 18, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 18, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00