Windmill synchronization in an electric propulsion system

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12017788
SERIAL NO

17446341

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A propulsion system is described that includes an electrical bus, a generator configured to provide electrical power to the electrical bus, a plurality of propulsors configured to provide thrust by simultaneously being driven by the electrical power at the electrical bus, and a controller. The controller is configured to synchronize a rotational speed of an individual propulsor from the plurality of propulsors with a rotational speed of the generator after the individual propulsor has become unsynchronized with the rotational speed of the generator by controlling at least one of the rotational speed of the generator, nozzle area of the individual propulsor, or a pitch angle of the individual propulsor.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ROLLS-ROYCE NORTH AMERICAN TECHNOLOGIES INC2059 S TIBBS AVE INDIANAPOLIS IN 46241

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Armstrong, Michael James Indianapolis, US 21 157
Blackwelder, Mark Jon Indianapolis, US 22 132

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Dec 25, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 25, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 25, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00