Coated substrates and methods of preparing the same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 12018174
APP PUB NO 20210324203A1
SERIAL NO

17271303

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present invention relates to a substrate having (a) a first material applied to at least a portion of the substrate, and (b) a coating layer deposited from a powder coating composition including a film-forming resin, and optionally a crosslinker that is reactive with the film-forming resin, in direct contact with at least a portion of the substrate to which the first material has been applied. The first material is (i) a catalyst that catalyzes cure of the powder coating composition, (ii) a component reactive with the film-forming resin and/or the crosslinker of the powder coating composition, and/or (iii) a rheology modifier.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
PPG INDUSTRIES OHIO INC3800 WEST 143RD STREET CLEVELAND OH 44111

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Chasser, Anthony M Greensburg, US 117 797
Larimer, Troy James North Huntingdon, US 9 3
Lemon, Steven Joseph Lower Burrell, US 6 3
Martin, Justin Jonathan Irwin, US 13 9
Niederst, Craig Daniel Valencia, US 3 2
Schneider, John R Allison Park, US 69 688
Woodworth, Brian Edward Glenshaw, US 8 3

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Dec 25, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 25, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 25, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00