Advanced large scale field-erected air cooled industrial steam condenser

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 12018891
APP PUB NO 20230243592A1
SERIAL NO

18299698

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An air cooled steam condenser having heat exchanger panels supported in a heat exchange frame section. A bottom bonnet runs along the bottom length of each heat exchanger panel for delivering steam to the bottom end of condenser tubes in the heat exchange panel and for receiving condensate formed in those same tubes. The tops of the tubes are connected to a top bonnet. Uncondensed steam and non-condensables are drawn into the top bonnet from the condenser tubes. A steam distribution manifold is located below the heat exchange section perpendicular to the longitudinal axis of the heat exchange panels and delivers steam to each heat exchange panel via a single steam inlet located at a center point of each bottom bonnet.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
EVAPCO INCTANEYTOWN MD 21787

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Athron, Toby Belle Mead, US 5 1
Bugler, Thomas W Frederick, US 15 25
Hildebrandt, Ben Denver, US 5 1
Huber, Mark Sykesville, US 25 256
Libert, Jean-Pierre Frederick, US 23 58
Sexton, Wayne Taneytown, US 5 1

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Dec 25, 2027
7.5 Year Payment $3600.00 $1800.00 $900.00 Dec 25, 2031
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 25, 2035
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00