Method for producing a machining segment for the dry machining of concrete materials

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12030123
SERIAL NO

17415268

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method for producing a machining segment for a machining tool, where the machining segment is connectable to a basic body of the machining tool by an underside of the machining segment, includes producing a green body by placing first hard material particles in a matrix material in a defined particle pattern, where the first hard material particles have a projection with respect to the matrix material. The green body is processed by hot pressing under temperature and pressure between a first press punch, which forms the underside, and a second press punch, which forms an upper side of the machining segment, to form the machining segment, where the upper side is opposite from the underside.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
HILTI AKTIENGESELLSCHAFT9494 SCHAAN

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Sonderegger, Marcel Balgach, CH 26 85
Toldo, Cliff Vaduz, LI 16 50

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jan 9, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 9, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 9, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00