Composition, production method for molded object, and molded object

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 12031014
APP PUB NO 20200181366A1
SERIAL NO

16640202

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A composition comprising: a substance (A) comprising at least one metal atom selected from the group consisting of zinc, cobalt, niobium, zirconium, cadmium, copper, nickel, chromium, vanadium, titanium, molybdenum, magnesium, iron and aluminum, with the proviso that a metal organic framework is excluded; an organic substance (B) having at least two metal coordination sites capable of being coordinated to the metal atom to form a crystal, wherein the metal coordination sites are of at least one type selected from the group consisting of a carboxy group and a metal organic framework; and a coordination promoter (C) that undergoes a reaction or a phase transition upon stimulation to promote the coordination of the metal coordination sites of the organic substance (B) to the metal atom of the substance (A).

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SEKISUI CHEMICAL CO LTDOSAKA-SHI OSAKA 530-8565

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Dasanayake, Aluthge Rasika Ibaraki, JP 18 18
Ikoma, Atsushi Ibaraki, JP 3 2
Nomura, Shigeki Osaka, JP 21 207

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jan 9, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 9, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 9, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00