Hardware component configuration for autonomous control of powered earth-moving vehicles

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 12037773
APP PUB NO 20230407595A1
SERIAL NO

18241055

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Systems and techniques are described for implementing autonomous control of powered earth-moving vehicles (e.g., construction and/or mining vehicles), including to automatically determine and control movement around a site. For example, the systems/techniques may determine and implement autonomous operations of earth-moving vehicles by determining current location and positioning of an earth-moving vehicle on the site, determining a command for the earth-moving vehicle, and causing the earth-moving vehicle to perform the command—the autonomous operations may in some situations further include obtaining and integrating data from sensors of multiple types on the earth-moving vehicle, implementing coordinated actions of multiple earth-moving vehicles of one or more types, etc.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
AIM INTELLIGENT MACHINES INC14751 N KELSEY ST #105-528 MONROE WA 98272

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kotlaba, Robert Most, CZ 6 2

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jan 16, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 16, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 16, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00