Heat exchanger, method for manufacturing heat exchanger, and refrigerant cycle apparatus

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 12038239
APP PUB NO 20230063016A1
SERIAL NO

17979253

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A heat exchanger includes: a water-repellent coating film on part of a surface of the heat exchanger. The surface on which the water-repellent coating film is disposed includes a surface structure including protrusions. D/L<0.36, D/L>0.4×(L/H), D<200, L−D<1000, H>700, 0>1.28×D×10−2+2.77 ×(L−D)×10−3−1.1×D2×10−5−5.3×(L−D)2×10−7−9.8×D×(L−D)×10−6−2.0, and 90°<θ<120°, where L is an average pitch of the protrusions in nm, D is an average diameter of the protrusions in nm, H is an average height of the protrusions in nm, and θ is a contact angle of water on a smooth plane of the water-repellent coating film.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
DAIKIN INDUSTRIES LTDOSAKA-SHI OSAKA 530-0001

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Fujino, Hirokazu Osaka, JP 43 203
Mondaru, Debukuma-ru Osaka, JP 1 0
Nagano, Tomohiro Osaka, JP 30 169
Satou, Ken Osaka, JP 31 70
Toyoyama, Kiyotaka Osaka, JP 1 0
Ukai, Takuya Osaka, JP 1 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jan 16, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 16, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 16, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00