Phase power device and fluid experiment system

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 12038344
APP PUB NO 20230204395A1
SERIAL NO

17793195

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A phase power device, comprising: a circulation pipe (1) and a preset number of phase power control components (2), wherein the circulation pipe (1) is used to provide a channel for fluid circulation flow, and the preset number of phase power control components (2) are disposed on the circulation pipe (1) and used to drive fluid in the circulation pipe (1) to circulate and flow. Further provided is a fluid experiment system, comprising the phase power device. The phase power device and the fluid experiment system may enable the fluid to meet a set flow requirement during the experiment, thus reducing the use of auxiliary equipment, and reducing experiment costs.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
PETROCHINA COMPANY LIMITED100007 NO 9 NORTH MAIN STREET DONGCHENG DISTRICT BEIJING DONGZHIMEN BEIJING CITY BEIJING CITY 100007

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Chen, Xinglong Beijing, CN 65 9781
Han, Haishui Beijing, CN 5 2
Liu, Qingjie Beijing, CN 44 620
Wu, Jiazhong Beijing, CN 5 4
Yu, Hongwei Beijing, CN 21 13

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jan 16, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 16, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 16, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00