Method for monitoring flow in centrifugal separator

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12042802
SERIAL NO

17260928

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A centrifugal separator for industrial separation of a liquid-gas mixture, including a centrifugal separator body having a centrifugal separator body wall, the centrifugal separator body including a cylindrical section and a conical section, a gas outlet positioned at the top end of the centrifugal separator body and a liquid outlet positioned at the bottom end of the centrifugal separator body, the centrifugal separator body further including a liquid-gas mixture inlet orifice, positioned in the cylindrical section of the centrifugal separator body, and a detector for detecting the thickness of the liquid on the centrifugal separator body wall, wherein the detector is positioned in the cylindrical section. A method for monitoring the flow through such a centrifugal separator.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
YARA INTERNATIONAL ASAOSLO

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Andersen, Lars-Erik Porsgrunn, NO 1 0
Bujalski, Jakub Porsgrunn, NO 2 0
Karlsen, Stine Sandefjord, NO 1 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jan 23, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 23, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 23, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00