Method for producing a counter-form and method for manufacturing a part having a complex shape using such a counter-form

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12042953
SERIAL NO

17281386

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method for producing a counter-form (20) for manufacturing a part having a complex shape (24) by pressure sintering densification. The counter-form (20) is formed from successive layers produced by numerically-controlled three-dimensional (3D) additive printing according to the following steps: numerically recording a three-dimensional negative of the part to be produced (24) in a control unit of a three-dimensional additive printing system in order to constitute the positive form of the counter-form to be produced; producing the counter-form (20) using a 3D additive printing technique. The part having a complex shape (24d) is then manufactured by pressure sintering, then separated from the counter-form which is also sintered (20).

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
NORIMAT31300 TOULOUSE

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Beynet, Yannick Toulouse Occitaine, FR 2 0
Epherre, Romain Toulouse Occitaine, FR 5 12

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jan 23, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 23, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 23, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00