Structurally integrated energy supply systems for aircraft and methods of forming the structurally integrated energy supply systems

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 12043126
APP PUB NO 20200269708A1
SERIAL NO

16282096

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Structurally integrated energy supply systems for aircraft and methods of forming the structurally integrated energy supply systems. The structurally integrated energy supply systems include an aircraft structural component, a cell array, and a plurality of energy-producing inserts. The aircraft structural component at least partially defines an interior region. The cell array includes a plurality of cell walls that defies a plurality of elongate cell volumes and is positioned within the interior region. Each energy-producing insert in the plurality of energy-producing inserts is positioned within a corresponding elongate cell volume in the plurality of elongate cell volumes and is configured to produce a corresponding insert electric current. The cell array provides structural load distribution to the aircraft structural component via the plurality of cell walls and contributes to a structural stiffness of the aircraft structural component.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
THE BOEING COMPANY929 LONG BRIDGE DRIVE ARLINGTON VA 22202

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bernhardt, Roger D St. Charles, US 29 185
Drouin,, Jr Donald V O'Fallon, US 13 65

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jan 23, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 23, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 23, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00