Solar powered street lamp

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12044383
SERIAL NO

17445358

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Solar powered lamp posts are described. One post includes one or more solar panel assemblies located in an inverted pyramid cavity. The solar panel assemblies are configured to generate energy, for example, by collecting sun light. One or more drone charging stations are also provided which can charge a drone using the energy generated. The post also feature one or more light emitters powered by the energy generated. The post may also include a pyramid structure which supports the solar panel assemblies and the drone charging stations. The pyramid structure can include the solar panel assemblies on outward facing sides and open up to expose the drone charging stations. The solar panel assemblies may include a broom panel array. The array has a multiple power generating panels and a socket which secures each of the power generating panels in a radial direction from a central focal point.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
4D VISION CORP108 BARTHOLOMEW STREET PEABODY MA 01960

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Jacques, Jonathan Peabody, US 6 20

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Jan 23, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Jan 23, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 23, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00