Building material manufacturing apparatus and building material manufacturing method

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12053907
SERIAL NO

17434645

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A building material manufacturing apparatus includes a sieve portion 10 and a receiver 30 that receives a building raw material M that has passed through the meshes of the sieve portion 10. The sieve portion 10 includes a series of sheets that are each capable of performing a wave motion when the apparatus is operating, that have an inclination, and that are arranged in a direction of the inclination. The series of sheets include a sieve sheet 12 and a sieve sheet 13 positioned below the sieve sheet 12. In the sieve sheet 12, meshes having an identical size are arranged at a regular pitch in a sheet width direction W. In the sieve sheet 13, meshes having two or more different sizes are arranged or a mesh region R1 and a non-mesh region R2 are arranged, in the sheet width direction W. The receiver 30 is movable below the series of sheets. The building material manufacturing method includes, by using the apparatus, forming a mat on the receiver 30, the mat including a first layer formed from a part of the building raw material M that has passed through the meshes of the sieve sheet 12 and a second layer formed from a part of the building raw material M that has passed through the meshes of the sieve sheet 13.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
NICHIHA CORPORATIONNAGOYA-SHI AICHI 455-8550

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ikeda, Satoshi Nagoya, JP 200 1886
Nishioka, Hidenori Nagoya, JP 7 17
Norita, Hiroki Nagoya, JP 2 1
Yoshida, Kazuhisa Nagoya, JP 8 6

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Feb 6, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 6, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 6, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00