Transport system for an industrial confectionery machine

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12059009
SERIAL NO

17423561

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The invention relates to a conveyor system for moulds (12) of an industrial confectionery machine (2), which comprises a plurality of production stations (P1, P2, P3, P4, 3, 4, 5, 6, 7) and moulds (12) for producing at least one confectionery article, wherein with the confectionery machine (2), a mould (12) can be conveyed to the various production stations (P1, P2, P3, P4, 3, 4, 6,, 7) for successive production steps, comprising a conveyor rail (8, 8a, 8b, 72, 73, 74, 75, 76, 77, 79, 80, 81, 82) and a drive device (9, T1, 67, D1, D2, D3, G1, G2, G3), with which a conveyance movement for a mould (12) can be produced in order to convey the mould (12) along the conveyor rail (8, 8a, 8b, 72, 73, 74, 75, 76, 77, 79, 80, 81, 82) to the production stations (P1, P2, P3, P4, 3, 4, 5, 6, 7).

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
WINKLER UND DÜNNEBIER SÜSSWARENMASCHINEN GMBH56579 RENGSDORF

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Daumann, Jörg Nümbrecht, DE 1 0
Freund, Christian Kurtscheid, DE 12 35
Reinhard, Felix Rengsdorf, DE 1 0
Runkel, Rainer Rengsdorf, DE 3 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Feb 13, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 13, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 13, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00