Systems and processes for transferring heat using molten salt during hydrocarbon upgrading

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 12059663
APP PUB NO 20210316267A1
SERIAL NO

17271721

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A reactor system for thermally treating a hydrocarbon-containing stream includes a pressure containment vessel having an interior chamber defined by a first end, a second end, and at least one sidewall extending from the first end to the second end. A heat transfer medium converts electrical current to heat is positioned within the interior chamber of the pressure containment vessel, and the heat transfer medium has a first end face, a second end face, and channels extending between the first end face and the second end face. A heat sink reservoir includes molten salt, and at least one of a heater or heat exchanger is fluidly coupled to the heat transfer medium and thermally coupled to the heat sink reservoir.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
DOW GLOBAL TECHNOLOGIES LLC2211 H H DOW WAY MIDLAND MI 48674

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Biesheuvel, Cornelis Hoek, NL 7 3
Kamperman, Wim M Middleburg, NL 5 2

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Feb 13, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 13, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 13, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00