Hydrogen storage device and method of producing a hydrogen storage device

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 12061020
APP PUB NO 20210180837A1
SERIAL NO

17252243

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A hydrogen storage device is described. The hydrogen storage device comprises a heater/cooler module (6) and a pressure containment vessel (1) defining an interior volume and having within it: a thermally conducting network (4) having a face in thermal contact with the heater/cooler module (6), the shape of the thermally conducting network (4) being a fractal geometry in two or three dimensions; optionally a metal foam in thermal contact with the thermally conducting network (4); and a hydrogen storage material (5) in thermal contact with the thermally conducting network (4).

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
H2GO POWER LTDIMPERIAL WHITE CITY INCUBATOR TRANSLATION & I-HUB 84 WOOD LANE WHITE CITY LONDON W12 0BZ

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hamed, Enass Abo London, GB 2 2
O'Donnell, Kieran London, GB 4 8
Sperrin, Luke London, GB 5 9

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Feb 13, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 13, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 13, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00