Baby bed

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12064039
SERIAL NO

17297451

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A baby crib includes a crib body, the crib body includes: a crib frame formed by a plurality of rods; a soft goods made of a soft material and fixed on the crib frame; and a crib accommodating space enclosed by the crib frame and the soft goods. An entire upper rod or a portion of the upper rod on one of sides of the crib frame is adjustable in height in a vertical direction between upper and lower ends of the crib frame. The crib frame is provided with a tightening mechanism. When the upper rod is adjusted in height and drives the upper rod soft goods to move, the tightening mechanism is capable of being contracted or stretched correspondingly to provide a tightening force to the upper rod soft goods.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
CHINA WONDERLAND NURSERYGOODS CO LTD523648 GUANGDONG CITY IN DONGGUAN PROVINCE TOWN OF SILVER LAKE INDUSTRIAL ZONE DONGGUAN CITY GUANGDONG PROVINCE 523648

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Guo, Zhengwen Guangdong, CN 38 21

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Feb 20, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 20, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 20, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00