Projectile construction, launcher, and launcher accessory

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 12072173
APP PUB NO 20230324154A1
SERIAL NO

18078028

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A projectile includes a projectile housing with at least one compartment, an energizable energy storage means, a payload, a control circuit, and an initiator. The payload may be sequestered in one compartment of the projectile until the projectile is separated or opened. A ram element within the projectile may move within the projectile to cause the opening of a projectile. The projectile may include a means for activating the initiator via dynamic induction. In an example embodiment, the projectile comprises a coil that is operatively coupled to a magnetic element of a launcher. The projectile may be charged dynamically as via interaction between the coil and magnetic element as the projectile moves within the launcher.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
NL ENTERPRISES LLCCHEYENNE WY

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Huner, Cole Thompson's Station, US 1 0
Pedicini, Christopher Brentwood, US 99 1365
Pedicini, Joshua Nashville, US 15 8

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Feb 27, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 27, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 27, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00