Power conversion device

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 12074513
APP PUB NO 20220337155A1
SERIAL NO

17564313

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A power conversion device includes: semiconductor switching elements; a housing on which the semiconductor switching elements are fixed; a circuit board on which a driving circuit for driving the semiconductor switching elements is mounted and which is located opposite to and spaced apart from a fixing surface; insertion guides which are disposed on an opposing surface of the circuit board relative to the fixing surface; and elongated terminal extension members each having a length that is matched with a height of a pulse transformer, one ends of which are bonded to respective lead terminals, and the other ends of which extend toward the insertion guides; wherein the pulse transformer is disposed on the opposing surface so as to be opposite to major surfaces of the semiconductor switching elements.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MITSUBISHI ELECTRIC CORPORATIONTOKYO 100-8310

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Tsubaki, Yusuke Tokyo, JP 4 4

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Feb 27, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Feb 27, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 27, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00