Malonates and derivatives for in-situ films

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 12077649
APP PUB NO 20210277200A1
SERIAL NO

17328909

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present teachings contemplate a method comprising coating an polymeric material with a composition including a dicarbonyl compound and having a viscosity of from about 50 cps to about 500 cps, wherein the coating initiates either: (i) spontaneous polymerization (e.g., in less than about one minute) at room temperature of the composition without the addition of an initiator; or (ii) polymerization at room temperature at a selected later time with or without the addition of an initiator; and wherein the composition adheres or facilitates adhesion of the polymeric material to a substrate.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ZEPHYROS INC160 MCLEAN DRIVE ROMEO MI 48065

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Czaplicki, Michael Romeo, US 48 515
Hicks, Kevin Romeo, US 29 307
Lu, Yuan Romeo, US 82 691
Mazich, Kenneth Romeo, US 14 21
O'connor, Austin Romeo, US 6 38

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Mar 3, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 3, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 3, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00