Steel sheet

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 12077832
APP PUB NO 20230349022A1
SERIAL NO

18025862

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A steel sheet according to an aspect of the present invention has a predetermined chemical composition, in which a metallographic structure at a ¼ thickness portion includes, by volume percentage, a total of 50% or more of one or both of martensite and bainite and 8% or more of residual austenite, an average value of aspect ratios of prior austenite grains is 5.0 or more, number density of AlN is 3000 pieces/mm2 or more and less than 6000 pieces/mm2 at a depth position of 30 μm from a sheet surface, an internal oxidation layer in which at least a part of a crystal grain boundary is coated with an oxide is provided from the sheet surface to a depth of 5.0 μm or more, grain boundary coverage of the oxide is 60% or more in a region from the sheet surface to a depth of 5.0 μm, and a tensile strength is 980 MPa or more.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
NIPPON STEEL CORPORATIONCHIYODA-KU TOKYO 100-8071

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Suzuki, Yuya Tokyo, JP 108 258
Takeda, Kengo Tokyo, JP 117 280

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Mar 3, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 3, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 3, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00