Method for operating a chemical plant

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 12078086
APP PUB NO 20210301685A1
SERIAL NO

17286418

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A chemical plant and operating method therefor; the chemical plant comprises a steam turbine having a shaft, a first pressure turbine stage and a second pressure turbine stage, each being arranged on the shaft and being connected in series in terms of the steam process; steam for driving the steam turbine is obtained from a reactor plant, said reactor plant producing a hydrogen-containing substance from a carbon-containing energy-carrier stream; the steam is heated in an overheating step before being supplied to the second pressure turbine stage; the steam turbine has a third pressure turbine stage which is arranged on the shaft and which is connected between the first pressure turbine stage and the second pressure turbine stage in terms of the steam process; and the steam passes through the overheating step after exiting the third pressure turbine stage.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
BALTHASAR WOLFF40833 RATINGEN

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Balthasar, Wolff Ratingen, DE 3 3
Koss, Peter Ulrich Bad Homburg vor der Höhe, DE 10 63

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Mar 3, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 3, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 3, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00