Method of electric energy generation and power generation system, in particular a power plant

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 12078140
APP PUB NO 20230250795A1
SERIAL NO

18012659

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method and device for non-emission electric energy production, consisting in: generating negative pressure or vacuum inside a pressure vessel in its upper part constituting a vacuum chamber in whose space a turbine rotor is situated; setting a height of a liquid or water column in the lower part of the pressure vessel constituting a liquid or water column below the turbine rotor, wherein the vacuum chamber is directly connected with the liquid or water chamber situated below the vacuum chamber, and a conventional interface between them is determined by the upper surface of the liquid or water column; closing a first closing means and supplying a liquid or water by a means for supplying a liquid or water to the vacuum chamber.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
NOWAK ZYGMUNTKROSNO

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Nowak, Zygmunt Krosno, PL 7 17

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Mar 3, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 3, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 3, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00