Induced flow double disc pump assembly having rotating element

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 12078155
APP PUB NO 20240077067A1
SERIAL NO

17903225

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An induced flow reciprocating double disc pump assembly includes a rotating frame supporting a double disc pump, the rotating frame has a plurality of supports and a shaft defining a horizontal axis of rotation. A stationary frame supports the rotating frame and includes a plurality of bars and uprights and a flange bearing assembly engaged each of the shafts permitting rotation between the rotating frame and the stationary frame. A locking pin positions the rotating frame and the stationary frame at a plurality of positions relative to each other. A rotation crank is engaged to the shaft. The rotating frame has a first position relative to the stationary frame supporting the double disc pump in a vertical direction and a second position where the double disc pump is in a horizontal direction.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
WASTECORP PUMPS INCTORONTO

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Soja, Marc Johnson Toronto, CA 10 110

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Mar 3, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 3, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 3, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00