Conductive composite material

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 12080444
APP PUB NO 20230154642A1
SERIAL NO

18158154

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A conductive composite material that includes: particles of a layered material including one or plural layers, wherein the one or plural layers include a layer body represented by: MmXn, where M is at least one metal of Group 3, 4, 5, 6, or 7, X is a carbon atom, a nitrogen atom, or a combination thereof, n is not less than 1 and not more than 4, m is more than n but not more than 5, and a modifier or terminal T exists on a surface of the layer body, where T is at least one of a hydroxyl group, a fluorine atom, a chlorine atom, an oxygen atom, or a hydrogen atom; and a polymer material that includes a hydrogen acceptor and a hydrogen donor, a ratio of the particles of the layered material is more than 19% by volume but not more than 95% by volume.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MURATA MANUFACTURING CO LTDKYOTO-FU 617-8555

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Abe, Masanori Nagaokakyo, JP 95 791
Morita, Hiroyuki Nagaokakyo, JP 116 1035
Seko, Akari Nagaokakyo, JP 3 0
Sugiura, Kosuke Nagaokakyo, JP 12 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Mar 3, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 3, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 3, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00