Mechanical power transmission between solar trackers

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 12081164
APP PUB NO 20230163718A1
SERIAL NO

18058689

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

In an example, a system to facilitate installation of a drive linkage in a solar array at or below an installation surface includes a housing and first and second interconnection assemblies. The housing is installed on or below the installation surface and is configured to at least partially enclose and protect the drive linkage at or below the installation surface. The first interconnection assembly extends between a first drive assembly of a first solar tracker supported above the installation surface by a support structure and a first end of the drive linkage at or below the installation surface. The second interconnection assembly extends between a second drive assembly of a second solar tracker supported above the installation surface by the support structure and a second end of the drive linkage at or below the installation surface.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SHOALS TECHNOLOGIES GROUP LLCPORTLAND TN

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Solon, Dean Portland, US 42 153

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Mar 3, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 3, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 3, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00