Flotation line

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 12083539
APP PUB NO 20210308695A1
SERIAL NO

17264641

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A flotation line for treating mineral ore particles suspended in slurry is disclosed. The flotation line includes a scavenger part and a scavenger cleaner part. The flotation line is characterized in that the scavenger part or the scavenger cleaner part includes a flotation cell with blast tubes for introducing slurry infeed into the flotation cell; or in that the scavenger part or the scavenger cleaner part is followed by a flotation cell with blast tubes for introducing slurry infeed into the flotation cell. Further, a use of the flotation line is presented, as well as a flotation plant including a flotation line according to the invention.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
METSO OUTOTEC FINLAND OY33900 TAMPERE

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bourke, Peter Perth, AU 13 24
Coleman, Rob The Gap, AU 2 0
Rinne, Antti Espoo, FI 16 25
Schmidt, Steve Corinda, AU 17 318

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Mar 10, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 10, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 10, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00