Method for obtaining a product made of titanium alloy or a titanium-aluminium intermetallic compound

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 12083589
APP PUB NO 20240091850A1
SERIAL NO

18254966

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method for obtaining a product made of titanium alloy or a titanium-aluminum intermetallic compound by plasma torch melting, the alloy having an oriented structure, the method including heating the molten alloy surface in a casting ring with a plasma torch; cooling a cold zone of the casting ring over a length L1, the cooling forming a semi-solid crown of alloy; heating a hot zone of the casting ring over a length L2, thereby forming a solidification front, the flatness of which relative to a plane perpendicular to a drawing direction is less than 10°; and drawing the solidified alloy at a speed of more than 10−4 m/s in the drawing direction. The present disclosure also relates to a plant having one or more devices for implementing the method.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SAFRAN75015 PARIS

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Sallot, Pierre Jean Moissy-Cramayel, FR 16 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Mar 10, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 10, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 10, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00