Process and plant for producing hydrogen and for separating carbon dioxide from synthesis gas

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 12084347
APP PUB NO 20220144634A1
SERIAL NO

17524047

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present invention relates to a process for producing hydrogen and for separating carbon dioxide from synthesis gas using a physical absorption medium. The process comprises the steps where the synthesis gas and the absorption medium are cooled; carbon dioxide is removed from the cooled synthesis gas via the cooled absorption medium in a physical absorption step at elevated pressure; laden absorption medium is treated in a plurality of flash stages, wherein co-absorbed carbon monoxide, hydrogen and carbon dioxide are separately removed from the laden absorption medium; hydrogen is separated from synthesis gas freed of carbon dioxide in a physical separation step, wherein hydrogen as product gas and an offgas comprising hydrogen, carbon monoxide and carbon dioxide are obtained; product gas hydrogen and carbon dioxide are discharged from the process. The invention further relates to a plant for performing the process.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
L'AIR LIQUIDE SOCIETE ANONYME POUR L'ETUDE ET L'EXPLOITATION DES PROCEDES GEORGES CLAUDE75007 PARIS

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Linicus, Matthias Eppstein, DE 11 18
Schmidt, Sophia Frankfurt am Main, DE 26 30

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Mar 10, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 10, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 10, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00