Charging water oxidation reactor using recovered reactor energy

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 12084365
APP PUB NO 20210276898A1
SERIAL NO

17249505

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A charging system for charging a reactor with air used energy produced by the reactor and includes a vessel having a hollow interior cavity partially filled with a liquid slug, a first air pocket within the cavity on a first side of the liquid slug, and a second air pocket within the cavity on a second side of the liquid slug. The liquid slug forms a water trap seal in the cavity between the two pockets and moves within the vessel in a cycle in which gas is loaded into the first air pocket in a first stroke and gas in the first air pocket is compressed in a second stroke. Movement of the liquid slug during the second stroke is caused by an increasing pressure in the second air pocket due to introduction of high-pressure gas from the reactor into the second air pocket.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SREUS ENERGY LLC9805 S 500 W SANDY UT 84070

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Freeman, Paul James South Jordan, US 5 5
Kraczek, John Troy Farmington, US 9 11
Whipple, Gordon Ray Centerville, US 6 5

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Mar 10, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 10, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 10, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00