Feeder tank for a glass melter

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 12084378
APP PUB NO 20220332622A1
SERIAL NO

17232216

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A glass melting furnace and method for introducing batch feed material into a glass melter tank of the glass melting furnace are disclosed. The glass melting furnace comprises the glass melter tank, a feeder tank, and at least one conduit. The glass melter tank defines at least one melter tank inlet, a molten glass outlet, and an exhaust gas outlet, and the feeder tank, which is separate from the glass melter tank, defines a batch feed inlet and a feeder tank outlet. The at least one conduit is in fluid communication with the feeder tank outlet and the melter tank inlet. Moreover, the melter tank inlet is defined below a melt level of a glass melt contained within the glass melter tank and at least partially filling the at least one conduit.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
OWENS-BROCKWAY GLASS CONTAINER INCONE MICHAEL OWENS WAY PERRYSBURG OH 43551

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Shi, Liming Perrysburg, US 6 4

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Mar 10, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 10, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 10, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00