Wood timber framing connection joint

Number of patents in Portfolio can not be more than 2000

United States of America

PATENT NO 12084852
SERIAL NO

17067321

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A wooden structural joint is provided, including a wooden rectangular base member comprising, at one end, a removed center element, a plurality of removed center edge elements, and four intact corner elements, where the removed center element and the plurality of removed center edge elements are formed from vertical and horizontal cuts into the one end of the wooden rectangular base member, a plurality of horizontal members, each horizontal member having a height and further having a tab cut therein at one edge of the horizontal member, the tab cut at a percentage of the height such that all horizontal members fit securely together when assembled within the wooden rectangular base member, and a wooden rectangular top member having one end cut similar to the wooden rectangular base member.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SHIBUSA SYSTEMS LLC2050 POYDRAS ST NEW ORLEANS LA 70113

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bingler, Steven New Orleans, US 2 3
Gwynn, Michael New Orleans, US 9 32

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Mar 10, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 10, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 10, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00