Wind, wave, and water power generation system

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 12085063
APP PUB NO 20230272776A1
SERIAL NO

18314666

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A power generation system includes a flotation assembly configured to float in water and a first harnessing assembly coupled to the flotation assembly and disposed in an airflow above the water. The first harnessing assembly is configured to harness the airflow to create a first rotational energy. The system also includes a second harnessing assembly coupled to the flotation assembly and disposed in the water. The second rotational assembly is configured to harness movement of the water to create a second rotational energy. The flotation assembly also includes a generating module to convert the first and second rotational energies into electrical energy.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
FORCEGENIE LLC2060 N COLLINS BLVD SUITE 111 RICHARDSON TX 75080

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Russell, Bradford O Garland, US 5 7

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
3.5 Year Payment $1600.00 $800.00 $400.00 Mar 10, 2028
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 10, 2032
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 10, 2036
Fee Large entity fee small entity fee micro entity fee
Surcharge - 3.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00